Residential Work
Bathroom Remodel
Removed old tile on the floor and walls around the shower. Installed new backer on wall and floor. Installed floor and wall tile with corner shelves and inset.
Removed old tile on the floor and walls around the shower. Installed new backer on wall and floor. Installed floor and wall tile with corner shelves and inset.
2nd Floor Remodel
Installed the flooring, base trim 1/4 round, top of the window trim, and crown molding. Painted doors, door jambs, casings, base trim, crown molding, and walls, patching all holes, cracks, and imperfections.
|
Kitchen Remodel
Removed old cabinets, flooring, damaged drywall, and wall tile. Prepped all walls and floor for install, installed flooring, base trim, drywall, cabinets, counter tops, appliances, sink, outlet plates, and primed and painted walls.
|
New Addition flooring
Started with a fresh contractor floor. Installed sub-floor, 18" tile, and 1/4 round. Using 18" field tile we cut to follow customers' requested custom pattern
|
Other Completed Work
Custom Patterns, Wood Flooring, Wall Tile